Process Hub · Use processes and complete work

How to review linked document chains

Find linked stages and inspect missing or stale relationships.

On this page

Before you start

  • Have access to the chain and its linked processes/records. Know which source document it represents.

Follow these steps

  1. Open the Document chain process. Use Search chain or linked record and the State/Missing step/Stale links filters.
  2. Open Chain detail and confirm the source document/record identity before changing a relationship.
  3. Review Relationships, Completion evidence, Files and Audit timeline to see which stages exist and what remains missing.
  4. Use Refresh source to reload approved source information. Check Suggestions and Accept or Reject only after reviewing the proposed linked record.
  5. Use Upload file for permitted evidence. Override match or Unlink branch changes relationships; coordinate corrections with the document/process owner.
  6. Refresh and verify the chain’s links, evidence and state. Each linked record can still have its own draft/approval/lifecycle requirements.

What you should see

You can identify the specific missing or stale relationship requiring action.

If something goes wrong

A linked record cannot open

The chain link does not grant underlying record/process access. Ask for appropriate dependency access.

A suggestion looks wrong

Reject it and check source identity with the owner instead of accepting it to hide a missing step.

Need a hand?

Contact your organisation’s Emplyr administrator using your usual internal support channel.

How to ask for help